Industry Updates

Breaking the Low-Bid Cycle: Why Execution-First Contracting Wins in Utah Construction

Breaking the Low-Bid Cycle: Why Execution-First Contracting Wins in Utah Construction

Introduction:

If you’re a commercial developer or a city procurement officer in Utah (or anywhere in the Western U.S.), you know the story all too well. A project is awarded to the lowest bidder in a race to save money, only to spiral into delays, budget overruns, and headaches for everyone involved. The traditional low-bid contracting model might promise upfront savings, but it often delivers hidden costs and frustration. In this industry critique, we’ll break down why the “lowest bid” approach is failing and how an execution-first partnership with the right contractor can save you time, money, and reputation in the long run.

The Low-Bid Dilemma: When Cheap Turns Costly

Choosing the lowest bid can feel like the responsible choice—after all, you’re protecting the budget. But in practice, cheap bids often lead to expensive problems. In fact, a 2024 industry report found 57% of low-bid projects exceed their original budgets and 46% miss critical deadlines . The initial “savings” vanish quickly due to issues the low bidder didn’t account for, such as:

Scope Gaps and Change Orders: Incomplete bids often overlook important details. Contractors who win on a rock-bottom price may come back with change orders once work begins. It’s common to see missing scope details that result in costly add-ons mid-project . What seemed like the lowest price ends up ballooning the budget.

Quality Problems and Rework: Cutting costs can mean cutting corners. Low-bid contractors might use subpar materials or rushed labor to meet the price. The outcome? Cracked concrete, uneven floors, or structural issues that require expensive rework. A McKinsey study estimates rework from poor planning and execution can consume 20–30% of a project’s total costs – turning a $10 million job into a $13 million headache.

Delays and Missed Deadlines: The lowest bidder often underestimates the timeline or lacks the crew and experience to stay on schedule. Projects that should take months drag on for far longer. These delays don’t just hurt your pro-forma; they erode public trust when a civic project isn’t delivered on time.

Strained Relationships: When a project goes awry, fingers start pointing. Low-bid scenarios frequently lead to tension between owners, general contractors, and subcontractors. Everyone is frustrated – the developer or city expected better, the GC is stuck managing chaos, and the subcontractor is overwhelmed. This strain can sour partnerships and damage reputations.

Bottom line: The low-bid approach often sabotages itself. What’s the use of saving 5% upfront if it means fighting through delays and paying 20% more in fixes later?

Procurement Pitfalls: Why “Lowest Price” Can Mean Poor Value

City procurement officers face a unique challenge: regulations and public pressure often favor the lowest bid. It’s meant to ensure fairness and wise use of taxpayer dollars. However, strict low-bid rules can backfire, resulting in procurement inefficiencies like:

Endless Re-Bidding: If a low-bid contractor falters (misses deadlines or can’t meet specs), the project may need to be rebid or rescued by others. This restart wastes time and money, and it’s maddeningly inefficient for agencies trying to move quickly.

Paperwork Over Performance: Traditional procurement focuses heavily on compliance and price forms, not on vetting which contractor is truly capable of executing well. A company with a slick bid package can win even if their track record is spotty. Meanwhile, a slightly higher bidder with a stellar performance history gets overlooked.

Lowest Qualified Bidder? Public projects do usually require a “responsible” or qualified low bidder, but too often that bar is low. If the qualification criteria don’t weed out poor performers, taxpayers essentially gamble on the cheapest contractor and hope for the best. As many cities have learned, hope is not a strategy for capital projects.

The paradox is clear: a procurement system designed to ensure value can inadvertently undermine value. When a $5 million municipal project doubles in cost due to contractor failures, was the lowest bidder truly the best value? Of course not. Leading cities are now exploring “best-value” procurement models, which evaluate contractors on experience, past performance, and ability to deliver – not just price. Studies show that when owners choose contractors based on best value (not just low bid), they pay only about 1% more upfront on average, but see dramatically better outcomes, like 37% less cost growth during construction . In other words, a slightly higher contract award can prevent massive overruns down the road.

For procurement officers, the takeaway is bold but simple: insist on quality and competence, not just the lowest number. You’ll spend far less time putting out fires on delayed projects, and more time cutting ribbons on successful ones.

Misaligned Teams: The GC-Subcontractor Disconnect

Another often unspoken issue in our industry is the misalignment between general contractors (GCs) and their subcontractors under the low-bid model. Here’s what typically happens on a bid-driven project: a GC wins a job by undercutting competitors, then turns around and selects subs primarily by price to meet that tight budget. This chain reaction creates multiple points of friction:

Race to the Bottom: Subcontractors forced to slash prices may not have buffer for quality control or contingencies. The concrete sub, for instance, might use a smaller crew or lower-grade mix to save cost, resulting in slower progress or weaker work. The GC, in turn, gets frustrated at the sub’s performance, but ultimately set the stage by squeezing the price.

Communication Gaps: Low-bid subs often aren’t brought into the project early. They receive plans and specs late, with little chance for input or clarification. Misunderstandings or errors in execution then occur because the GC and subs never fully aligned on the plan. Instead of a team, you have silos.

Blame Game: When timelines slip or workmanship suffers, the GC-sub relationship can devolve into blame. The project manager might push the sub harder or even threaten penalties; the sub pushes back about unrealistic expectations or incomplete information. Collaboration gives way to conflict, and the project suffers further.

The solution is real partnership: GCs and subcontractors working in tandem from day one. This means involving key trades like concrete early in the planning phase, openly sharing schedules, constraints, and expectations. It also means GCs choosing subs based on trust and proven capability – not just the lowest quote on bid day. When each subcontractor is treated as a critical stakeholder rather than a commodity, they become invested in the project’s success. Aligned teams identify potential issues in advance and solve them together, instead of pointing fingers later.

At Messerly Concrete, for example, we thrive in collaborative build environments where we can lend our expertise early, coordinate closely with general contractors, and ensure our portion of work integrates seamlessly with the whole project. This kind of GC-sub alignment is a hallmark of an execution-first approach.

The Execution-First Approach: Prioritize Performance, Not Just Price

What do we mean by “execution-first”? It’s a partnership model where the primary focus is on a contractor’s ability to deliver exceptional results – on schedule, on budget, and at high quality – rather than on who offers the rock-bottom price upfront. In an execution-first approach, you:

Select Partners Wisely: Developers and cities identify contractors with a proven track record of performance. This means looking at their portfolio, client references, safety record, and expertise. Who has consistently delivered projects on time and above standards? Those are your contenders (and often, they won’t be the absolute cheapest).

Engage Early and Plan Thoroughly: The chosen contractor is brought on as a partner from the outset, not just a vendor. Together, you perform realistic scheduling, value engineering, and risk assessment before breaking ground. Issues get identified in preconstruction when they’re cheapest to fix. By investing time upfront, execution-first teams prevent expensive surprises later.

Maintain Open Communication: Execution-first contractors emphasize transparency—regular progress updates, honest reporting of issues, and collaborative problem-solving. There’s no hiding problems to save face or profit; the mindset is “let’s get it done right.” This professional candor builds trust and keeps the project on track.

Align Incentives with Outcomes: Instead of a cut-throat lowest bid contract, consider contract models that encourage performance. For instance, quality incentives or schedule bonuses for meeting milestones can be built in. When the contractor knows that excellence is rewarded (not just assumed), you get everyone’s best effort. The result is a true partner mentality: the contractor is as invested in the project’s success as you are.

The execution-first philosophy is gaining traction across the industry as owners see the difference. You’re essentially paying for value, not paying for problems. By spending a bit more time and money upfront to secure a high-performance team, you avoid the cascade of issues that plague low-bid projects. It’s the difference between “we finished as promised” and “we’re 6 months behind and scrambling.”

Real Results: Saving Time, Money, and Reputation

Shifting to an execution-first partnership isn’t just a nice idea – it delivers tangible benefits that directly address your biggest headaches:

Time Savings: Projects stay on schedule or even finish early. A reliable, execution-focused contractor will flag scheduling risks in advance and allocate the right resources to prevent delays. For a developer, opening a facility on time means faster revenue and less carrying cost. For a city, an on-time project means meeting public commitments – no embarrassing news articles about a library that’s a year late. Time is money, and execution-first contracting protects your timeline.

Cost Control (and Reduction): Ironically, choosing the “cheapest” bid often leads to the highest final cost. An execution-first approach flips this script. With experienced planning and fewer surprises, change orders are minimizedand the project budget holds steady. You might invest a bit more in hiring the right team, but you avoid the huge overruns. Remember that statistic: best-value projects had significantly lower cost growth than low-bid projects . In plain terms, spending wisely now saves a fortune later.

Reputation and Peace of Mind: Every project is a reflection on its stakeholders. Developers build their reputations with each successful development delivered to tenants and investors. City officials and agencies earn the public’s trust when projects come in on budget and actually work as intended. By partnering with a contractor who delivers on promises, you protect your professional reputation. There’s no need to spin excuses to your board or the public. Instead, you’ll be showcasing a ribbon-cutting ceremony for a job well done. The intangible benefit here is peace of mind – knowing you won’t have to lie awake at night worrying if your contractor will show up or if that foundation pour is going to fail inspection. An execution-first partner has it handled.

Messerly Concrete: Your High-Performance Partner in Utah & the West

At Messerly Concrete, we’ve built our entire business around the execution-first mindset. As a leading concrete contractor in Utah and the surrounding region for over 25 years, we’ve seen firsthand what works and what doesn’t in construction. That’s why we refuse to play the low-bid, cut-corner game. Instead, we focus on delivering superior results every time. Our approach includes:

Proven Track Record: We have completed 1,000+ projects across Utah, Idaho, Colorado, and Wyoming – from large-scale distribution centers to precision tilt-up buildings – all delivered on time and to exacting standards . Our 100% client satisfaction and retention rate speaks to the partnerships we form . Clients come back to Messerly because they know we get it right the first time.

Expert Team & Technology: Our team of seasoned project managers, ACI-certified lead finishers, and concrete specialists plan every detail of execution. We leverage cutting-edge techniques (like 3D laser screeds and advanced project management software) to ensure quality and efficiency. This preparation means no surprises during the pour or cure. When challenges do arise, our experts are prepared to solve them without missing a beat.

Collaborative Project Management: We work closely with general contractors, developers, and city engineers as a true partner – sharing schedules, coordinating around other trades, and adjusting proactively to keep the overall project on track. We don’t just show up to dump concrete; we integrate with your team’s goals and communicate constantly. Your deadline becomes our deadline, your success our mission.

Commitment to High Standards: “Good enough” is not in our vocabulary. Every Messerly project, whether a city infrastructure upgrade or a private commercial foundation, is treated with the same rigor and attention to detail. We adhere to strict quality checks at each stage, preventing rework. And safety (for our crew and your jobsite) is non-negotiable – a disciplined site is a productive site.

By choosing a contractor like Messerly Concrete, you’re embracing the execution-first philosophy. Our clients often tell us how refreshing it is to have a contractor who doesn’t need babysitting and delivers exactly what was promised – or better. That’s the kind of partnership that makes your job easier.

Build It Right the First Time: A Call to Action

It’s time to break the low-bid cycle. If you’re tired of busted budgets, endless delays, and managing fiascos, make a bold decision on your next project: prioritize execution and quality from day one. Whether you’re planning a new commercial development or a critical public infrastructure project in Utah or the Western U.S., you deserve a contracting partner who will champion your project’s success as fiercely as you do.

Don’t settle for the illusion of savings that low bids promise. Instead, secure the real savings and confidence that come with an execution-first partnership. Messerly Concrete stands ready to be that high-performance partner for you.

👉 Ready to experience stress-free, on-schedule construction? Contact our team at Messerly Concrete today to discuss your project. Let’s turn your plans into a rock-solid reality – without the headaches. Together, we’ll build something great, and build it right the first time.

More Posts

Evolution of Concrete Construction

Evolution of Concrete Construction In 2025, industrial construction is evolving faster than ever. From robotics-powered distribution centers to seismic-resistant data centers, the demands placed on

Author

Michael Beckrest
Chief Marketing Officer
Messerly Concrete Contractors

Send Us A Message